LogospacerHomeAboutServicesPortfolioClientsCase Studies

 

Amba Towel Warmers / Port Maputo / Job Tsunami / Control Southern

Presentation of 25 year Port Master Plan and the redesign of existing website to better serve Operational requirements


Renderings of Port Facilities over a project period. The upgrade of the Port website to support Operational needs such as ISPS document processing, Visitors Security and Navigational/shipping information such as Channel conditions, Berth Status.


Website traffic dramatic increase with less than 3% bounce rate.